Mon–Fri 8:30–17:00 AEST South Brisbane, QLD
Get Quote
Home›Selections
Selections

Choose once. It goes into the kit.

A kit is cut and packed to a list, so finishes are part of the order, not an afterthought. Floors, tiles, joinery, surfaces, appliances and cladding are settled at design stage and issued as one schedule with your drawings.

8 ranges scheduled into the kit
4 looks, each a named product set
13 named manufacturers — two under agreement
One schedule, priced EXW / FOB, cut and packed to the list
Why we schedule selections

Selections are a manufacturing input.

The factory has to know what is going into the walls, the wet areas and the cabinet run before components are cut — set-downs, service positions, edge profiles and packing all follow from that list. So selections are settled at design stage and issued back as one schedule.

  • Scheduled at design stage, before components are cut
  • Issued as one schedule with the kit documentation pack
  • Pricing basis EXW / FOB China unless stated otherwise
  • Installed by your licensed local builder — FrameLab supplies kits only
  • Changes free before release; re-quoted after
The Ranges

Eight ranges, one schedule.

What is available depends on your plan, your state's requirements and the lead time you are working to. We confirm the shortlist before anything is released.

  1. 01

    Floors

    Engineered timber, SPC or porcelain on one underlay and set-down, so thresholds meet cleanly. Wet areas are costed separately for fall and substrate.

  2. 02

    Walls & Ceilings

    Plasterboard, wet-area board, cornice profiles and optional feature panelling. Board orientation and joint positions are set on the drawings, not decided on site.

  3. 03

    Tiles

    Floor and wall tiles nominated room by room, with trim, adhesive and grout allowances listed, so the quantity that lands is the quantity the job needs.

  4. 04

    Joinery & Cabinetry

    Kitchen, wardrobe and vanity carcasses and doors in Treezo board, cut, edge-banded and labelled to the plan. About Treezo →

  5. 05

    Benchtops & Surfaces

    Sintered stone, porcelain slab, solid surface or stainless, templated to the carcasses. Engineered stone is excluded — Australia bans benchtops containing 1% or more crystalline silica. Every surface ships with a silica declaration and SDS.

  6. 06

    Appliances

    Cooktops, rangehoods, ovens and dishwashers chosen as a set, so clearances, services and cupboard widths are fixed before the run is manufactured.

  7. 07

    Sanitaryware & Tapware

    Basins, WCs, showers, baths and mixers per bathroom, with rough-in dimensions issued with the kit drawings so plumber and tiler work to the same numbers as the factory.

  8. 08

    Facade & Cladding

    Cladding, battens, trims and exterior finishes detailed on the same drawings as the weatherproofing behind them. Decorative mouldings come from ARTEC.

Supply Network

Build with premium brands.

Every range is made by a manufacturer we can name and show — under supply agreement or under evaluation, category by category, against the standard that category has to meet in Australia.

Inclusion here is not an appointment. Model-level certificates, NATA-accredited test reports and safety data sheets are required before anything is written into your project documents — the standard for each category is named on request.

The Process

Four steps, in this order.

  1. 01

    Shortlist

    Work from the ranges above against your plan and budget. We tell you what each option does to the lead time, in writing.

  2. 02

    Confirm

    Selections are signed off at design stage — the last point at which a change costs nothing but the decision.

  3. 03

    Cut and pack

    The factory releases components against the schedule, labels them to the plan and packs them in the order the house comes together.

  4. 04

    Install

    Your licensed local builder installs to the issued drawings. FrameLab supplies kits — it does not carry out local construction or certification.

Want a selection schedule for your plan?

Send us the plan you are working to. We will come back with the ranges that fit it, the lead time each one adds and what has to be decided before release.

Get a Quote Email us